Project focus    Compton and Edrich stands, Lord’s Cricket Ground  Compton and Edrich stands, Lord’s Cricket Ground   Project focus


                                                          Design and construction of the Compton and Edrich stands, Lord’s Cricket Ground redevelopment



 FIGURE 5: Thumbnail sketches used to explore different materiality options. Blue = steel, dark grey = in situ concrete, light grey = precast concrete

















  BURO HAPPOLD








 the southwest side of the Ground almost   FIGURE 6: Revit
 2.5m lower than the northwest side. In   model of stand    PAUL EDDLESTON/BURO HAPPOLD
 matches, it causes deviation to the ball when   showing steel,
 foundations and
 bowling; for the project, it resulted in different   shallow tunnel in   FIGURE 7:
 lengths of the lower tiers all the way through   red. Half-toned   Sketches for
 the Compton and Edrich stands.  pink elements are   developing
          canopy design
 existing pile caps
 Other design considerations
 A series of options was explored for the
 design of the elliptically shaped canopies,
 including steel monocoque and semi-
 monocoque (Figure 7). The final option was
 a steel framework that supports a further
 secondary timber beam network and a    FERGUS McCORMICK/BURO HAPPOLD
 membrane covering. Relatively frequent
 spacing of the timber was chosen to        FERGUS McCORMICK/BURO HAPPOLD       FERGUS McCORMICK/BURO HAPPOLD
 enable a fairly smooth membrane surface
 sympathetic to the synclastic shape of the
 Media Centre.  PROBING TOOK PLACE    RAJ MISTRY/BURO HAPPOLD
 The canopy’s surface geometry was highly
 unusual, taking a number of iterations to   RELATIVELY LATE AS IT    FIGURE 8: Grid line B lower column, after fabrication
 refine. The team worked with computational   COULD ONLY FOLLOW   and awaiting entry to paint shop. Photo shows thick
 software (Grasshopper/Dynamo) to more   baseplates with cruciform shear keys, anchor holes and
 readily analyse and produce Revit model   DEMOLITION   grout holes. To right are connections to floor and lower-   FIGURE 9: Elevation of backspan part of Level 2 raker    FIGURE 10: Level 3 raker, showing cantilever portion,
                                            showing, at right, tapered flanges towards connection for
        tier raker structures whose geometry and form varied
                                                                                with field of play tip to right of image and junction with grid
 information with a rapidly developing design.  around stand  rear outer connection to CHS columns  line B node to centre of image
 The bridge link serves both stands at
 second-tier level, allowing spectators to   to ensure robustness in accordance with BS   Fire protection to the structure was provided
 travel between the two hospitality areas. It   EN 1991 . Imperfections were considered   predominantly using intumescent paint.  As well as demolition and groundworks,   times. Inevitably, some members of the supply   assembly. The three subassemblies were then
 2
 is 40m long × 3.5m wide and supported   by designing for notional horizontal loads in   the first phase also included the erection of   chain had to contend with Covid impacts, which   dimensionally checked and welded together to
 on a single row of 7.5m high circular hollow   accordance with BS EN 1993 . The lateral   Construction  the main steel frames of the stands along   affected productivity levels.   form the single assembly, prior to painting and
 3
 section (CHS) columns.  effects of the live load of the crowd were also   First closed season  with precast floor and terrace units. Work   loading for delivery to site.
 The seating deck is formed of conventional   considered through an equivalent horizontal   Impact of Covid-19  on the new structures began in January/  Steel frame fabrication and erection  The grid line B box columns form the
 precast units and makes no contribution   load as a 5% factor of the vertical load.  Westminster City Council (WCC) granted full   February 2020, before concrete started to   Severfield’s steelwork package involved some   backbone of the primary structural stability
 to the overall lateral resistance of the main   The fire strategy for Lord’s has been   planning permission for the project in January   be placed in March/April. The project was   complex fabrication, partly due to the effect   system for the stands, incorporating moment
 frame.  designed in line with a typical Green Guide   2019. ISG was subsequently awarded the   maintaining programme despite one of the   of significantly varying geometries through the   connections in both the transverse and
 Secondary structures of the new stands,   approach , utilising sterile circulation and   contract in July 2019.  wettest winters in the past decade. WCC   stands; this was especially true for the columns   longitudinal directions. Not surprisingly, these
 4
 such as external stair towers, are compliant,   concourse spaces, and enclosing areas of   Construction works started in August 2019   was supportive in allowing weekend working   (Figure 8) and plate girder rakers (Figures 9   are among the most heavily engineered
 being unbraced and taking stability from   fire load (such as hospitality areas, bars/  after the Ground’s final international cricket   for a four-month period.  and 10), which provide support to the precast   steelwork details on the project.
 the main frame. At the interfaces of the new   concessions and store rooms) in fire-resisting   match of the season had taken place, but while   At this point, the Covid-19 pandemic hit,   concrete terraces.  The final connection details reflect Buro
 stands with other existing stands, there are   construction. Spectator evacuation is via the   it was still being used for County Championship   with a lockdown imposed in March 2020.   As part of the fabrication method, each   Happold’s original concept very closely, with
 movement joints in the floor plate and in   ground-floor vomitories for the lower tier, and   games. Therefore, the old stands were   ISG rapidly put a Covid plan into operation   raker component was split into three individual   the columns split above and below the primary
 the connection detailing to ensure lateral   the rear escape stairs for the upper tiers.   demolished with hoardings in place to separate   and site works continued safely with between   subassemblies. This made turning, handling   rakers at levels 2 and 3, effectively enabling
 movements were not restricted.  The evacuation is designed to be within the   working areas from the pitch, with work   100 and 125 operatives on site each day,   and machining in the factory a lot easier than   the cantilever terrace rakers to be continuous
 Vertical and horizontal ties were provided   eight minutes specified by the Green Guide.   completed in November/December 2019.  adhering to social distancing measures at all   if the rakers had been fabricated as a single   through the column, while facilitating moment
 30
 30                                                         31
                                                            31
                                                  thestructuralengineer.org  |  May 2022
 May 2022  |  thestructuralengineer.org
 May 2022  |  thestructuralengineer .org          thestructuralengineer .org  |  May 2022  Journal of  The Korea  Structural  Engineers Association  61