Project focus    Compton and Edrich stands, Lord’s Cricket Ground                                                                                                    Compton and Edrich stands, Lord’s Cricket Ground   Project focus


                해외작품소개


              FERGUS McCORMICK                    beverage concessions, two new restaurants,   ground level, with the outer perimeter of the                                                                alignment was at odds with the setting-out
                                                  new washrooms and a high-level connecting   stands conceived as a lighter colonnade with                                                                  of the frames at the northern and southern
              MSt, MSc, MA, CEng, FIStructE, FICE
                                                  walkway for improved crowd circulation.  slim columns. The structural framing of each                                                                     ends in a fan arrangement (Figure 6). The
              Partner, Buro Happold, Bath, UK
                                                   In contrast to the previous stands, the top   stand developed to a moment frame solution in                                                              superstructures of these northern and southern
                                                  level is partially covered with a steel-framed roof,   each direction.                                                                                    frames were all different and the variation was
                                                  which complements the subtle curvature and   In the cross-section, the main part of the                                                                   compounded by their main bases all needing
              TIM SULLIVAN
                                                  form of the design while creating a distinctive   main frames was generally supported on two                                                              to be designed to miss the tunnel. There were
              IEng, AMIStructE                    silhouette, helping to heighten the sense of   main columns with two further supports for the                                                             seven special foundation scenarios transferring
              Technical Director, ISG, London, UK  drama of sporting events.         lower tier (Figure 3). The rear columns became                                                                         columns over the tunnel.
                                                   A key requirement was to develop a coherent,   pin-ended, enabling a transparent welcoming                                                                 Further ground constraints included the
                                                  integrated structural design and construction   elevation with a refined aesthetic; the lateral                                                           substructure of two previous versions of the
              IAIN HILL
                                                  strategy respecting the high-quality aesthetic   strength and stiffness was focused on an                                                                 stands on this part of the site, which were
              BEng, CEng, FIStructE, FICE         that the client and architect required.  inner main column coupled with the bending                                                                       shown on archive drawings. The previous
              Associate Director, Severfield, Bolton, UK  This article describes how Buro Happold   resistance of main grid-line rakers. Lateral                                                            stand was founded on pads, but the new, taller
                                                  considered all materiality for the frame design,   resistance in the longer directions was also from                                                      development with its higher loads was founded
                                                  before selecting steel after an extensive   moment action, with the main front column                                                                     on rotary auger-bored piles in London clay. Pile
              PAUL EDDLESTON
                                                  construction programming study. The design   again providing the key strength and stiffness.                                                              diameters were 600mm and 750mm. Despite
              MSc, BSc, CEng, MICE                diagram of the steel moment frame in each   The main supporting columns were some of                                                                    PAUL EDDLESTON/BURO HAPPOLD  the availability of records, the team decided that
              Senior Structural Engineer, Buro Happold, Bath, UK  direction was chosen to suit the required   the largest elements in each of the two stands:   FIGURE 3:                                  every pile location should be probed to mitigate
                                                  openness, but the frame was designed with pin-  typically 1400mm × 500mm box sections, with   Framing diagram for                                         risk – a decision subsequently justified by the
                                                                                                                                     cross-section and
                                                  ended columns on the outer perimeter to enable   100mm thick base plates fixed with Macalloy                                                              fact that many probes located unexpected
              MICK SLACK                                                                                                             bending moment
                                                  a light colonnade elevation and stiffer columns   bar anchor assemblies. There are nine of these   diagram against                                        obstructions that were not shown on the record
              BEng, CEng, MIStructE               on an inner line. The moment connections of the   columns in the Compton stand and seven in the   lateral loads                                           drawings. These locations required modified pile
              Engineering Manager, Severfield, Bolton, UK  frame were key details, with Severfield providing   Edrich stand. Positioned on grid line B, which                                               positions and special pile caps.
                                                  important design input for the final choice.  is in the middle of each stand, the columns sit                                                               The principal challenge was maintaining the
                                                   The article also discusses some of the   towards the back of the lower tier, support the   Designing for programme    hosting of matches while increasing the ground   construction programme as these discoveries
              RAJAN MISTRY
                                                  challenges of working within the existing site   7m cantilevering seating area of the second   Construction for sports projects within existing   capacity and operational efficiency to enhance   arose during the construction phase; probing
              BSc (Hons)                          and the unprecedented demands imposed by   tier, and also support the underside of the   grounds needs to understand and respect   spectator experience. However, site constraints   took place relatively late as it could only follow
              Engineering Technician, Buro Happold, Bath, UK  Covid-19, explaining how ISG approached and   uppermost seating level.  the sports event calendar. This project was   and working within an operational site presented   demolition. During the peak of the piling, revised
                                                  worked through these.                The steel section types, depths and           no exception and the schedule included   challenges. For this project, there were complex   designs, models, drawings and reinforcement
              Introduction                                                           connections give a clear legibility to the framing   demanding quantities of work in each closed   interfaces with adjacent structures, but the   drawings needed to be produced very quickly,
              Marylebone Cricket Club (MCC) has led the   Design challenges          diagram of the design (Figure 4). The lower     season with two key dates:          below-ground challenges were the most   requiring close coordination and communication
              game of cricket for over 200 years and helped   Design diagram         tier was not included in the radial lateral stability   |   Closed season 1 (September 2019 to spring   demanding.    between Buro Happold and ISG.
              take it from a national pastime in England to   The layout and organisation of floors and   system as a low-level prop, because of its   2020): demolition and new superstructure.  A shallow Thames Water tunnel runs right   Another oddity of the existing site is that
              a global obsession. At its heart is Lord’s, the   seating tiers responded to the functional needs   variable relationship to the main frame around   |  Playing season 2020 – key date 1: stands   through the footprint of the stands. Its straight   Lord’s is famous for having a sloping field, with
              ‘Home of Cricket’, where MCC is dedicated to   of the buildings, with the overall form and shape   the stands and because its optimum design   ready for new season with seating capacity
              growing its reputation as the most celebrated   developed to complement the JP Morgan   choice for construction was uncertain for some   of 11 600, albeit with limited new fit-out and
              venue in cricket. Lord’s has been at its current   Media Centre. Each stand, including its roof,   time. Eventually, the lowest part of the lower tier   no roof.
              location in St John’s Wood, northwest London   was spatially offset from the Media Centre to   was generally formed of in situ concrete and the   |   Closed season 2 (September 2020 to April   FIGURE 4: Early sketch developing
                                                                                                                                                                          member and connection design of steel
              for over 200 years.                 allow each part of the new elevation to be read   whole of the tier was laterally isolated from the   2021): completion of hospitality, canopy and   solution. Note significant service hole
                Responding to an increasingly competitive   individually, but also so that all three separate   remainder of the main frame.  other site works.           requirements in beams
              sporting environment, the Ground has   building blocks – the Compton stand, the Edrich   The frame was designed to the dynamic   |  Playing season 2021 – key date 2: stands
              been undergoing upgrade work to steadily   stand and the Media Centre – could be read as   criteria and method of the IStructE guide .   complete for matches in the new season.
                                                                                                                 1
              improve facilities in accordance with a staged   a single new composition.  The cantilevers are long, but the frame is not   Stands open for England versus New
              masterplan. MCC Chief Executive and   The key structural design challenge was   designed for concert events, which significantly   Zealand on 3 June.
              Secretary, Guy Lavender, has stated: ‘MCC is   to maintain a light, airy feeling to the whole   reduces the spectator excitation and, hence,
              committed to ensuring Lord’s remains the best   development and very open circulation at   demand on the cantilevers.    Before the onset of the project, the initial
              place in the world at which to watch and play                                                                          assumptions had been for a concrete-framed
              cricket.’                                                                                                              structure. Steel was subsequently chosen
                The latest phase of the masterplan                                                                                   for the main frame following a fully detailed
              encompasses redevelopment of the Compton   FIGURE 2: View from Nursery                                                design, programming and cost option study
                                                      Ground (west) during later stages
              and Edrich stands, which are situated either   of construction showing new                                             led by Buro Happold, which compared the
              side of the distinctive aluminium JP Morgan   stands, either side of JP Morgan                                         comparative merits of a steel design, a precast
              Media Centre at the famous Nursery End of   Media Centre                                                               concrete design, an in situ concrete design and
              the Ground (Figure 1). The previous stands                                                                             other variants (Figure 5).
              were dated and lacking in facilities. The new                                                                            Significant constructional analyses found that
              stands transform the Nursery End, providing                                                                            steel construction was both quickest and the
              world-class facilities, opening up views both                                                                          only option that enabled the programme to be
              to the Pavilion and back towards the Nursery                                                                           achieved. Buro Happold optimised the structural
              Ground (Figure 2), and adding another design                                                                           design for minimum construction time using both                                                           PAUL EDDLESTON/BURO HAPPOLD
              enhancement to Lord’s.                                                                                                 conceptual thinking and traditional sketching of
                A three-tier arrangement takes the capacity                                                                          sequences along with advanced constructional
              of the new stands from 9000 to 11 600 seats,    STEVE MACEY/BURO HAPPOLD                                               analysis. The schedule was so tight that floors
              accompanied by two new main sponsor                                                                                    were optimised for piece count to reduce
              boxes. There are new wheelchair spaces,                                                                                cranage and hook time.
              additional accessible seating exceeding
              industry best practice, and modern associated                                                                          Site constraints
              amenities. Other features include food and                                                                             Phased developments can allow continued


                                                                 28
                                                                 28                                                                                                                     29
           58    건 축 구 조    2022 _ 05 _ 06   제29권 / 제03호  May 2022  |  thestructuralengineer.org                                                                               thestructuralengineer.org  |  May 2022
                                                        May 2022  |  thestructuralengineer.org
                                                                                                                                Lords Cricket St_TSE May 2022_The Structural Engineer.indd   29                                           20/04/2022   09:50